We are currently hiring for many positions. Discover Opportunities Call a Manager Now
When The Brick expanded into the old Sears location at the world-famous West Edmonton Mall, there were significant challenges. IFS was able to remove two layers of old tile, glue, and grout from previous renovations, as well as provide significant substrate repairs before successfully installing 55,000 sqft of full exposure polished concrete. The application of a 5,000 sqft feature section of stained polished concrete was provided as a unique focal point.
Copyright © 2025 Industrial Floor Systems. All Rights Reserved. Web Design by Whetham Solutions
Thanks for your interest in our services as IFS. Please contact us via the form below for a quote, or give us a call at 705-726-7140.